[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[IDV #PVE-466454]: Looping over forecast valid time



> Full Name: Marty Baxter
> Email Address: address@hidden
> Organization: Central Michigan University
> Package Version: 6.0u1
> Operating System: MacOS 11.4
> Hardware: 13" Macbook
> Description of problem: Hi Yuan,
> 
> Can the IDV loop through multiple model forecasts valid for the same time in 
> order to examine how the forecast changes with lead time?
> 
> I see that Unidata's realtime THREDDS server has available a "Full Collection 
> (Reference/Forecast Time)" entry that has data available for all forecasts 
> valid for a particular time (reftime and time coordinates for each variable).
> 
> I have my own archived data I'm trying to implement this with, but wanted to 
> see if it was possible to view in the IDV before proceeding.
> 
> Thanks,
> Marty
> 
> 
Hi Marty,

I think it is a good idea to set up your own TDS and with the full collection 
(FMRC) the IDV might be able to do what you want.

One example is the "timeStepAccumulation" function I added in the 6.0 release,  
and we should be able to do a more complicated analysis.

Yuan

Ticket Details
===================
Ticket ID: PVE-466454
Department: Support IDV
Priority: Normal
Status: Open
===================
NOTE: All email exchanges with Unidata User Support are recorded in the Unidata 
inquiry tracking system and then made publicly available through the web.  If 
you do not want to have your interactions made available in this way, you must 
let us know in each email you send to us.