ROC engineering
will be performing routine maintenance activities to the Silver
Spring portion of the Level II Network. The activity is a
software & security upgrade required on all servers in the
Silver Spring Level II cluster. To simplify and isolate the load process, the ROC will be moving the AGGREGATE function to Norman at 9:00 AM (Central) and moving it back to Silver Spring at approximately 3:30 PM (Central) the same afternoon. This will cause a brief interruption in service each time from both locations when the AGGREGATE is moved but keeps the load procedure on the "backup node" vice the aggregating cluster. -- ********************************************************************** *Donald J. Horvat * ____ * * * / \ _____ _______ _____* *Sr. Systems Engineer *( ) / ___ ) / ___ / / ___/* * Support Contractor * \____/ / /__/ / / / / / / / * *WSR-88D Radar Operations Center* |\/| / ___ < / / / / / / * * * |/\| / / / / / /__/ / / /___ * *1313 Halley Circle * |\/| /_/ /_/ /______/ /_____/ * *Norman, OK 73069 * |/\| * * * WSR-88D RADAR OPERATIONS CENTER * ********************************************************************** *Phone: (405) 573-3418 * e-mail: address@hidden * *FAX: (405) 573-3340 * * ********************************************************************** |
begin:vcard fn:Donald J Horvat n:Horvat;Donald org:Radar Operations Center;Systems Engineering Group adr:;;1313 Halley Circle;Norman;OK;73069;USA email;internet:address@hidden title:Senior Systems Engineer tel;work:405-573-3418 url:www.roc.noaa.gov version:2.1 end:vcard