Plot stuck in loop?

 Hi,

  I'm able to plot my data, and following the example in Test30.java
I've added date/time labels.  However, now that I've made the switch
from "1, 2, 3" to the date/time labels, it seems one of my sets is
causing VisAD to go into an infinite loop.  The data set has only 1
point.  It's a 2D plot, time along the x axis.  The plot begins to draw
and the y axis appears (correctly drawn), then I get "please wait" in
the lower left corner and that's it.

  Any suggestions?

 Thanks!

Paul


------------------------
Paul Gifford, Capt, USAF
NOAA/NGDC
325 S Broadway EGC2
Boulder CO 80303

303-497-6556 voice
303-497-6513 fax


  • 2000 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the visad archives: