Due to the current gap in continued funding from the U.S. National Science Foundation (NSF), the NSF Unidata Program Center has temporarily paused most operations. See NSF Unidata Pause in Most Operations for details.
Hi, I'm able to plot my data, and following the example in Test30.java I've added date/time labels. However, now that I've made the switch from "1, 2, 3" to the date/time labels, it seems one of my sets is causing VisAD to go into an infinite loop. The data set has only 1 point. It's a 2D plot, time along the x axis. The plot begins to draw and the y axis appears (correctly drawn), then I get "please wait" in the lower left corner and that's it. Any suggestions? Thanks! Paul ------------------------ Paul Gifford, Capt, USAF NOAA/NGDC 325 S Broadway EGC2 Boulder CO 80303 303-497-6556 voice 303-497-6513 fax
visad
archives: