Due to the current gap in continued funding from the U.S. National Science Foundation (NSF), the NSF Unidata Program Center has temporarily paused most operations. See NSF Unidata Pause in Most Operations for details.
NOTE: The nws-changes
mailing list is no longer active. The list archives are made available for historical reasons.
Topic: GOES-12 East/West Maneuver and GOES-12 Switch December 17, 2007 Message Issued: December 17, 2007, 1545 UTC Satellites Impacted: GOES-12 and GOES-10 Products Impacted: GOES-12 and GOES-10 Imager and Sounder Data Date/Time of Initial Impact: December 17, 2007 0436 UTC -------------------------- Details: The stop maneuver for GOES-12 was performed this morning. GOES-12 is currently in INR recovery and is operating on the following schedule:
From 1315 UTC through 2044 UTC -- GOES-12 Post Maneuver Recovery Including:
* Full Disk Images (19 minute scan) at XX15 and XX45 * CONUS Soundings at XX46 2045 UTC December 17 -- GOES-12 Routine Scan Operations Resume OSDPD plans to switch GOES-East operations (GINI/NOAAPORT and Products) from GOES-10 back to GOES-12 beginning 1700 UTC. GOES-12 will still be operating on the INR schedule (above) until 2045 UTC. Upon verification of product processing, GOES-10 will be released back to GOES-South America operations.
nws-changes
archives: