20060305: NCEP update

NOTE: The nws-changes mailing list is no longer active. The list archives are made available for historical reasons.

<snip>

FROM:                   John H. Ward
                        Chief, Production Management Branch

Subject:                Changes to the NWS Production Suite


1.  On Tuesday, 7 March, the 06Z and 18Z NAM runs will begin 26 minutes later.  This will provide resources required for a future implementation of a 06Z and 18Z Short Range Ensemble and make all four daily cycles symmetric.

2.  The moratorium on changes at the NWS Telecommunications Operations Center (TOC) is expected to end in mid March.  As soon as the moratorium is lifted, NCEP will begin the transition from GRIB1 to GRIB2, by placing duplicate GRIB2 files on the TOC FTP server.  Both sets of data will remain on the TOC FTP server for a minimum of 180 days.

3.  A directory of NCEP model data available on both the TOC and NCEP FTP servers is located at:

    http://www.nco.ncep.noaa.gov/pmb/products/

The WEB site also contains a full parameter list for each data file. Currently information is only available for NAM, GFS, Global Ensemble, RSAS, RUC, ECMWF, and UKMET.  Information on other data availability will be added shortly.

4.  Upcoming changes to NCEP's production suite can be viewed at the following website:

    http://www.nco.ncep.noaa.gov/pmb/changes/

This WEB site contain details on any product or timing changes that are associated with upcoming implementations.
<snip>



  • 2006 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the nws-changes archives: