20021013: Circuit down-Bracknell-ADMIN NOTICE NOUS42 KWNO (fwd)

NOTE: The nws-changes mailing list is no longer active. The list archives are made available for historical reasons.


864 
NOUS42 KWNO 130735
ADMNFD
SPECIAL NCEP DISCUSSION
CENTRAL OPERATIONS/NCEP/NWS/WASHINGTON DC
0730 UTC SUN OCT 13 2002 

130730Z...PLEASE NOTE...

THE BRACKNELL COMMS CIRCUIT FROM ENGLAND TO NWS/TOC
HAS BEEN DOWN SINCE 13/0323Z DUE TO A MAJOR CABLE
CUT IN LONDON ENGLAND..SO THERE WILL NOT BE ANY 
TRANSFER OF DATA BETWEEN NWS AND BRACKNELL UNTIL
THE COMMS ARE RESTORED..NO UPTIME IS KNOWN AT
THIS TIME..

THE IMPACT IS: THE 13/00Z UKMET MODEL WILL NOT BE 
AVAILABLE..NO NEW EGRR BULLETINS FROM BRACKNELL..
NO NEW SIG WX GRAPHICS AND ASDAR/AMDAR DATA FROM
BRACKNELL..WE WILL KEEP YOU INFORMED OF ANY CHANGES
TO THIS LIST..

OTHERWISE..THE 06Z ETA IS RUNNING ON TIME..THE 06Z
GFS SHOULD START ON TIME AT 0847Z..


FYI...

REMINDER...ON 17 OCTOBER 2002 NCEP WILL EXERCISE ITS BACKUP
MODEL DISSEMINATION SYSTEM.  THIS EXERCISE WILL BE CONDUCTED
DURING THE 12Z MODEL CYCLE.  INFO ON THE TYPE OF PRODUCTS AVBL
FROM THE BACKUP PROCESSING AND THEIR APPROX DELIVERY TIMES CAN
BE FOUND AT THE FOLLOWING WEB SITE...

http://www.ncep.noaa.gov/NCO/PMB/nwprod/osobackup/ncep_backup.html

ALL LOWER CASE EXCEPT NCO AND PMB MUST BE CAPITALIZED.

SMITH/SDM/NCO/NCEP
NNNN                                                                        




  • 2002 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the nws-changes archives: