Problem with NEXRAD Composites

Hello,

We feed off of the NSF machine to get the 1-km NEXRAD composites. Data stopped coming about around 1520Z. I'm wondering whether the problem is a processing, network, or LDM problem at NSF.

Jim
--
James P. Koermer                E-Mail: koermer@xxxxxxxxxxxxxxxxx
Professor of Meteorology        Office Phone: (603)535-2574
Meteorology Program             Office Fax: (603)535-2723
MSC #48                         WWW: http://vortex.plymouth.edu/
Plymouth State University
Plymouth, NH 03264




  • 2004 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the ldm-users archives: