[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[CONDUIT #POY-637798]: .25 degree GFS LDM testing help?



Hi Steve,

re:
> CIRA would be glad to offer any LDM testing help with the .25 degree
> GFS CONDUIT feed.
> 
> We have a machine (swamp.cira.colostate.edu) pulling the .5, 1, and 2.5
> degree files from idd.
> 
> I actually am going to turn off the 2.5 degree, and start only grabbing
> the 6-hourly forecast periods (f00,f06,f12,f18, etc) for the .5 and 1
> degree files.

Thanks for the offer to help test distribution of the 0.25 degree GFS data
in the IDD CONDUIT datastream!

The timing for adding the 0.25 degree GFS to CONDUIT is being controlled
by the ability of top level IDD relay sites to handle this content along
with all of the rest of the data that they are now passing along.  The
current target for turning on relay of the 0.25 degree data is in early
July as this gives the relays enough time to upgrade their systems (machines
and networks) to be able to handle the data hopefully without introducing
unwanted latencies.

Thanks again for the offer.  If we can move faster than the July target, we
will likely ask you to participate in early trials.

Cheers,

Tom
--
****************************************************************************
Unidata User Support                                    UCAR Unidata Program
(303) 497-8642                                                 P.O. Box 3000
address@hidden                                   Boulder, CO 80307
----------------------------------------------------------------------------
Unidata HomePage                       http://www.unidata.ucar.edu
****************************************************************************


Ticket Details
===================
Ticket ID: POY-637798
Department: Support CONDUIT
Priority: Normal
Status: Closed