20020402: future testing-ADMIN NOTICE NOUS42 KWNO (fwd)

NOTE: The nws-changes mailing list is no longer active. The list archives are made available for historical reasons.


665
NOUS42 KWNO 021512
ADMNFD

SPECIAL NCEP DISCUSSION
CENTRAL OPERATIONS/NCEP/NWS/WASHINGTON DC
1505 UTC TUE APR 2 2002

021505Z...THE 12Z NCEP PRODUCTION CYCLE IS ON TIME.

THIS MORNINGS GATEWAY COMMUNICATIONS OUTAGE HAD NO ADVERSE
AFFECT ON DATA INGEST FOR NCEP MODELS.  THE 12Z MODEL DATA
INGEST WAS VERY GOOD.

FYI...THERE WILL BE A TEST OF THE NCEP BACKUP PROCEDURES
DURING THE 4/4/00Z CYCLE.  BACKUP PRODUCTS FOR THE NCEP GLOBAL
MODEL WILL BE PRODUCED FROM THE NAVY FNMOC NOGAPS MODEL AND
UKMET MODELS.  BACKUP PRODUCTS FOR THE NCEP ETA MODEL WILL
BE FROM USAF AFWA MM5 MODEL.  NGM MODEL OUTPUT AND NGM MOS
GUIDANCE WILL BE DISSEMINATED AT THE END OF THE TEST PERIOD BUT
WILL DELAYED AS MUCH AS 5-6 HOURS.

ADDITIONAL INFORMATION ON THE NCEP BACKUP TEST CAN BE FOUND AT
HTTP://WWW.NCEP.NOAA.GOV/NCO/PMB/NWPROD/OSOBACKUP/NCEP_BACKUP.HTML
ALL LOWER CASE EXCEPT /NCO/PMB WHICH ARE UPPER CASE.

KNEAS/SDM/NCO/NCEP
NNNN


---------- End Forwarded Message ----------


  • 2002 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the nws-changes archives: