ADMIN NOTICE NOUS71 KNCF (fwd)

NOTE: The nws-changes mailing list is no longer active. The list archives are made available for historical reasons.


936
NOUS71 KNCF 061205
ADANCF
.
PLEASE PASS TO MIC/HIC, ESA AND SOO
.
REMINDER ** REMINDER ** REMINDER
THE BACKUP TEST FOR NCEP OPERATIONS WILL OCCUR
ON TUESDAY, 6 FEBRUARY 2001 BEGINNING AT 1315Z, DUE TO A
SCHEDULE CHANGE IN THE NEXT SPACE SHUTTLE LAUNCH.
DURING THE FOUR HOUR TEST PERIOD, THE 12Z ETA AND AVN
PRODUCTS WILL BE PRODUCED BY THE NCEP BACKUP PROCESSING
RUNNING ON THE OOS SYSTEM.  SINCE THERE IS NO BACKUP FOR
THE NGM, THE 12Z NGM PRODUCTS WILL BE PRODUCED ON THE
IBM AT THE CONCLUSION OF THE TEST.  DETAILS OF THE PRODUCTS
AVAILABLE FROM THE BACKUP OPERATIONAL CONFIGURATION
DURING THE OUTAGE CAN BE FOUND AT:
.
        http://www.ncep.noaa.gov/NCO/PMB/ncep_backup.html
.
IF THE FIELD BELIEVES THIS TEST SHOULD BE DELAYED DUE TO
THE POTENTIAL FOR SEVERE WEATHER ON FEB 6, THEY SHOULD
CONTACT THE SENIOR DUTY METEOROLOGIST (SDM) AT NCEP
AND COORDINATE A DELAY IN THE TEST.
.
NCF


---------- End Forwarded Message ----------




  • 2001 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the nws-changes archives: