980316: Scheduling change-NOUS (fwd)

NOTE: The nws-changes mailing list is no longer active. The list archives are made available for historical reasons.

049 
NOUS40 KWBC 161917
FOS/NOAAPORT NOTICE NO. 1196          MARCH 16... 1998

REF        FOS/NOAAPORT NOTICE NO. 1191

SUBJECT    SCHEDULING CHANGE

GOES-10 IMAGER CONUS SCANS WILL NOW BE GENERALLY
AVAILABLE TEN TIMES PER HOUR IN LIEU OF TWELVE TIMES PER
HOUR.  FOR FURTHER SCHEDULING DETAILS PLEASE REFER TO THE
NESDIS SATELLITE SERVICES DIVISION WEB SITE

                 HTTP //WWW.SSD.NOAA.GOV.

ADDITIONAL NOAAPORT/AWIPS TESTING

NOAA REQUIRES A SECOND TEST OF GOES-10 CONUS DISTRIBUTION
ON NOAAPORT/AWIPS TO FULLY EVALUATE ITS DATA PROCESSING
DISTRIBUTION  AND DISPLAY SYSTEMS. THE SECOND TEST OF
GOES-10 RAPID SCAN IMAGER DATA VIA NOAAPORT WILL BE CONDUCTED
ON MARCH 17  1998  FROM 1400 UTC TO 2000 UTC.  PLEASE NOTE THAT
THIS NEED FOR A SECOND TEST WILL DELAY ROUTINE GOES-10 CONUS
IMAGER PRODUCTS VIA NOAAPORT UNTIL TEST RESULTS /FROM THE
MARCH 12 AND MARCH 17 TESTS/ ARE FULLY EVALUATED BY NOAA
PERSONNEL.  DIRECT READOUT  GOES-TAP AND RAMSDIS DISTRIBUTION
OF GOES-10 CONUS PRODUCTS ARE NOT AFFECTED AND WILL BE
AVAILABLE SHORTLY AFTER 1900UTC  MARCH 16  AS ORIGINALLY
SCHEDULED.

NOAA WILL ANNOUNCE THE OFFICIAL START OF ROUTINE GOES-10 CONUS
PRODUCTS VIA NOAAPORT AFTER THE TEST DATA ARE EVALUATED.

PLEASE REFER SATELLITE SCHEDULE QUESTIONS TO JOHN PAQUETTE
NESDIS/SSD  AT /301/ 763-8051  EXT. 110.
END
NNNN



 



  • 1998 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the nws-changes archives: