Radar Operations
Center Engineering will be performing a planned maintenance
activity to the Level II system. The activity is an aggregate
swap back to the Silver Spring Level II cluster to restore
operations to the default configuration.
Start Time: 9:00 AM (Central time) Thursday April 6th, 2017
Duration: 10 minutes
Event: Aggregation swap to the Silver Spring Servers
The activity is anticipated to take about 10 minutes to
complete and will effect data flow of the "Both Level II
Paths" for up to 5 minutes while the Silver Spring servers
negotiate Level II connections back to each NEXRAD site.
Both NL2 server locations are part of this activity and a
minor (5 minutes) service interruption via primary path and
secondary is anticipated. This may get pushed out in time if the
current CWD is extended so as to NOT interfere with NWS
operations.
--------------------------------------------------------------------
FYI - NWS has postponed maintenance
activities on 4/8/2017 in Boulder, CO.